Water Main Installation (W) W-1 Trench Detail W-2 New Tee in New Water Main W-3 New Tee in Existing Water Main W-4 Tapping Sleeve and Valve W-5 In-line Valve in Existing Main W-6 In-line Valve in New Main W-7 New Cross W-8 Water/Sewer Crossing W-9 Water Utility Separation Requirements Water System Appurtenances (WA) WA-2 Fire Hydrant WA-3 2” Blow Off WA-4 Thrust Block WA-5 Water Connection Direct Tap WA-6 Water Connection Using a Saddle WA-7 Water service connection greater than 4-inches Hot Mix Asphalt Paving (HMA) HMA-1 Bristol Temporary and Permanent HMA Paving HMA-2 Barrington Temporary and Permanent HMA Paving HMA-3 Warren Temporary and Permanent HMA Paving HMA-4 HMA Paving on RI State Roads HMA-5 HMA Paving on RI State Roads with Concrete Subbase Water Metering Appurtenances (WM) WM-1 Meter Installation Detail WM-2 1-Inch Single Service Meter Pit WM-3 1 ½ -inch and 2-inch Single Service Meter Pit WM-4 Hot Box Meter Installation