From this page, you can download the Bristol County Water Authority standard details and forms for purposes of construction projects involving the BCWA water distribution system.  All documents are in PDF form.

TitleDetail #Date
Standard pipe trench detail012018-08-15
Standard detail for a new tee installed in new main02a2018-08-15
Standard detail for a new tee installed in an existing main02b2018-08-15
Standard detail for cutting and capping
an old tee & main from an existing main & installing a new tee and main to that same existing main
02c2018-08-15
Standard detail for installing a tapping sleeve and valve032018-08-15
Standard detail for a new mj valve installed in an existing main03a2018-08-15
Standard detail for a new mj valve installed in a new main03b2018-08-15
Standard detail for the installation of a new cross042018-08-15
Standard detail for the installation of a 1” air release052018-08-15
Standard detail for a hydrant installation onto a main062018-08-15
Standard detail for the installation of a 2” blowoff assembly072018-08-15
Standard detail for the installation of thrust blocks and restraints at fittings082018-08-15
Standard detail for installing iron pipe direct tap service connections10a2018-08-15
Standard detail for installing a service connection with a service saddle-
for any service connection to a.c. (transite), hdpe or pvc pipe
10b2018-08-15
Standard detail for service connections 4 inches & greater10c2018-08-15
BCWA Standard Detail for Pavement Replacement – Town of Bristol11a2018-08-15
BCWA Standard Detail for Pavement Replacement – Town of Barrington11b2018-08-15
BCWA Standard Detail for Pavement Replacement – Town of Warren11c2018-08-15
BCWA Standard Detail for a Meter Installation12a2018-08-15
BCWA Standard Detail for 1" Single Service Meter Pit12b2018-08-15
BCWA Standard Detail for 1.5" and 2" Single Service Meter Pit12c2018-08-15
Standard detail for WATER & SEWER SERVICE CROSSING DETAIL NEW CONSTRUCTION09a2018-08-15